Scrabster Ferry Terminal
Details
Client:

Scrabster Harbour Trust

Location:

Scrabster

Completed:

2003

Summary

Completed for Scrabster Harbour Trust / North Link Ferries in 2003 this ferry transit building demonstrates a strong maritime aesthetic, addressing a highly exposed location in Scrabster Bay by means of a ‘wrapover’ milled aluminium roof plate. A fully glazed upper level provides a waiting / observation area with views over the adjoining the ferry berth.